The Hanang project area in Central Tanzania: open ground on the eastern margin of the Lake Victoria Gold Field

Marvel Gold · ASX:MVL · Central Tanzania

Hanang Gold Project

Drilling the eastern edge of a +70-million-ounce goldfield.* Marvel owns 100% of 380km² that has never been tested with modern drilling. That test started in May 2026, and it is happening right now.

Phase 1 drilling live No JORC resource No assays released

Get assay alertsFree InvestorHub account

Phase 1 RC drilling in progress · first assays expected H2 2026, pending

Project information verified 11 June 2026

100%
Marvel-owned
380km²
Landholding
8
Prospecting licences
~5,000m
Phase 1 RC underway
+70Moz
Surrounding goldfield*
5
Drill-ready targets
Regional map placing Hanang on the eastern margin of the Lake Victoria Gold Field, near Golden Pride, Geita, Bulyanhulu and the greenstone belts
Hanang on the eastern margin of the Lake Victoria Goldfields.

The belt

Tanzania's Lake Victoria Gold Field has yielded more than 70 million ounces of gold.* It hosts AngloGold Ashanti's Geita mine, Barrick's Bulyanhulu mine and Perseus Mining's Nyanzaga development, where a 4.0-million-ounce ore reserve was confirmed in February 2026.*

Hanang sits on the field's eastern margin, in the Iramba-Sekenke greenstone belt - the same belt that hosted Tanganyika's first commercial gold mine at Sekenke. On the same regional structure, the Golden Pride mine produced about 2.2 million ounces.* Immediately next door, AngloGold Ashanti is spending up to US$9 million to earn into the Golden Eagle project.*

The difference at Hanang: most of this ground has never been drilled with modern techniques.

Golden Pride · Resolute

Same regional structure, on strike from Hanang

~2.2Mozproduced*

Golden Eagle · AngloGold Ashanti

Adjacent farm-in, commenced December 2025

US$9.0Mcommitted*

Geita · AngloGold Ashanti

Tanzania's largest gold mine, same goldfield

483kozin 2024*

Nyanzaga · Perseus

First major new Tanzanian gold mine in ~17 years

4.0Mozreserve*

Field crew in hi-vis examining ground beside a red dirt track under a wide sky
Field crew working the project ground. Surface sampling at Hanang defined a 3km gold-in-soil anomaly at Sophia.
BIF-HOSTED GOLD, SIMPLIFIED Folded iron-rich layers; gold drops out along the structures surface steep gold shoots continue at depth iron-rich BIF layers, folded and faulted structures feed gold-bearing fluids
Schematic only, not to scale. Analogues: Mt Magnet (Australia), Lupin (Canada).

The rocks

Gold at Hanang is the orogenic, banded-iron-formation (BIF) hosted type. In plain terms: ancient iron-rich seafloor sediments were folded and faulted deep in the Earth, and gold-bearing fluids moved along those structures, dropping their gold where the chemistry was right - often in and around the iron-rich layers.

Where the structures are squeezed and re-folded, gold can stack up in steep, high-grade shoots that continue a long way down. Marvel's geologists compare the Winston system to Australia's Mt Magnet and Canada's Lupin, both classic BIF-hosted systems.

The host structure at Hanang is the roughly 50km Wandela Basoto Shear, a mineralised corridor crossing the full landholding.

For the geologists

Archean Nyanzian volcanics, sediments and BIFs of the Tanzania Craton (Lake Nyanza Superterrane). Alteration assemblage of amphibole, garnet, chlorite and pyrrhotite with significant quartz veining. Mineralisation is structurally controlled along the ~50km Wandela Basoto Shear, with NW-SE, NE-SW and N-S trends. Historic third-party drilling on the same mineralised BIF unit on neighbouring ground returned up to 16m @ 55.23g/t gold (EcoGraf ASX announcement, 23 May 2024) - not a Marvel result and not necessarily indicative of Hanang.*

Gossan hand specimen with boxwork texture held above red gravel
Gossan with boxwork texture, where sulphides have weathered out at surface.
Banded ironstone hand specimens showing iron-rich banding
Banded ironstone specimens collected during surface work.
Historical artisanal pit in red earth with vegetation regrowing inside it
Historical artisanal workings on the project ground. Gold at surface, never tested by modern drilling.
Mt Hanang rising above Lake Balangida under a broad sky
Mt Hanang and Lake Balangida from elevated ground in the project district.
Reverse circulation drill rig with mast raised among acacia trees at Hanang
The Phase 1 RC rig on site at Hanang.

Live: Phase 1 RC drilling

01Winston ExtensionDrilling now
02SophiaUp next

Behind them in the pipeline: New York (~3km strike), Boundary, Fold Nose, Sophia Shear and the new Phoenix Trend corridor.

~5,000m reverse circulation, the first modern drilling of this ground ~60 days planned program, commenced 29 May 2026 PhotonAssay in-country for faster turnaround No assays released yet - first results expected H2 2026

The drill

Marvel's 5,389 line-kilometre drone magnetic survey, flown over the full 380km² by Tanzanian operator SkyPM Solutions and completed in early 2026, sharpened the picture considerably. It extended the New York target from about 1km to about 3km of strike within a stacked quartz-vein system, and found an entirely new structural corridor in the north-east: the Phoenix Trend.

Combined with soil geochemistry - 3,444 samples, including a 3km gold-in-soil anomaly at Sophia - that work defined the drill-ready targets now being tested.

Mar - Aug 2025

Acquisition

100% of Cobra Resources acquired; completed August 2025. Landholding since grown from 230km² to 380km² across 8 licences.

2025

Soil geochemistry

3,444 samples analysed; a 3km gold-in-soil anomaly defined at Sophia.

Nov 25 - Feb 26

Drone magnetics

380km² / 5,389 line-km survey flown; results March 2026. New York extended to ~3km; Phoenix Trend identified.

May 2026

Phase 1 drilling begins

~5,000m RC commenced 29 May 2026. Winston Extension first, then Sophia.

H2 2026

First assay results Pending

Every result will be reported against the original ASX announcement, good or bad.

What investors are watching

Winston ExtensionWhether initial holes confirm the targeted BIF-hosted structures below cover.
SophiaHow drilling tests the 3km gold-in-soil anomaly after Winston Extension.
Assay timingFirst results are expected in H2 2026, but remain pending and subject to change.
Next decisionResults will determine whether follow-up drilling is justified. No resource is implied.

Get assay alerts

Read this before anything else

Hanang has no JORC mineral resource, and no drill assay results have been released. This page quotes no tonnes, no grades and no ounces for Hanang itself, because none exist yet. The figures you see for neighbouring mines are third-party context, not Marvel results.*

Success in this phase means intercepts that confirm gold mineralisation is continuous and well-graded enough to justify a larger follow-up program. Early drilling can equally return narrow or low-grade intercepts. That is what exploration is.

Exploration pathway

1Target definition Soil geochemistry and drone magnetics completed.
2First-pass drilling Phase 1 RC program underway.
3Assays and interpretation Results pending.
4Follow-up decision Depends on the evidence from drilling.
5Mineral resource Not established.

The terms

Tanzania is one of Africa's largest gold producers, with a clear and well-defined mining code. The jurisdiction is attracting serious capital: AngloGold Ashanti has restarted greenfields exploration from a new Dodoma office, and Perseus is building Nyanzaga, the first major new Tanzanian gold mine in roughly 17 years.

Government interest
A minimum 16% non-dilutable free-carried interest applies at the mining-licence stage only. Hanang holds prospecting licences, so this is not triggered.
Royalty & tax
6% gold royalty plus a 1% clearing levy (royalty reduced to 4% where gold is refined in-country); 30% corporate tax.
Access
Sealed roads from Arusha (~2.5 hours) and Dodoma (~3 hours); borehole water near Lake Basoto; established local drilling and services sector.
Company position
Cash of $3.73M at 31 December 2025, per the December 2025 quarterly.
Marvel Gold personnel outside the Hanang District Commissioner's office in Katesh
Marvel Gold personnel at the Hanang District Commissioner's office, Katesh.
Read the full Tanzania 101 explainer →

First assays: expected H2 2026

Results remain pending and the timing is subject to change. Get each Hanang announcement through InvestorHub.

Get assay alerts

* Regional and neighbour figures are third-party context, not Marvel Gold results: the +70Moz Lake Victoria Gold Field endowment (Tanga Resources ASX announcement, 17 July 2017, as cited by Marvel; corroborated by EcoGraf ASX materials, December 2025); Golden Pride ~2.2Moz produced (Resolute Mining company records); AngloGold Ashanti Golden Eagle US$9.0M farm-in (EcoGraf ASX announcement, 23 May 2024; commencement 17 December 2025); Geita 483,000oz produced in 2024 (as reported in EcoGraf ASX materials); Nyanzaga 4.0Moz ore reserve (Perseus Mining ASX release, 20 February 2026); historic result of 16m @ 55.23g/t (EcoGraf ASX announcement, 23 May 2024) relates to neighbouring ground and is not a Marvel result. Proximity to these mines and projects does not imply that Hanang hosts similar mineralisation.

Exploration results referenced on this page are extracted from Marvel Gold's ASX announcements, including the March 2026 magnetic survey results and the 29 May 2026 drilling commencement announcement. The Company is not aware of any new information or data that materially affects the information included in those announcements. Exploration results are reported under the supervision of Mr Timothy Strong (Member IMMM), a Competent Person under JORC 2012, who consents to the inclusion of the exploration results in the form and context in which they appear.

This page contains forward-looking statements, including drill plans, timelines and expected assay dates, which are subject to risks and uncertainties. Actual outcomes may differ materially. Hanang has no JORC mineral resource and no drill assay results have been released; nothing on this page should be read as implying a mineral resource.