TABAKOROLE MINERAL RESOURCE GROWS TO 910KOZ AT 1.2 G/T GOLD
54% increase in ounces + 20% increase in grade
Marvel Gold Limited (ASX: MVL) (Marvel or the Company) is pleased to announce the JORC Mineral
Resource Estimate for the Tabakorole Gold Project (Tabakorole or the Project).
HIGHLIGHTS
Marvel confirms its successful transition to a Mali-focused gold explorer, delivering a JORC 2012
Mineral Resource of 910,000oz grading 1.2 g/t gold (at a 0.6 g/t cut-off) (Table 1).
The upgraded Mineral Resource represents a 54% increase in ounces and a 20% increase in grade
from the 2007 resource estimate (NI 43-101) with a total combined Mineral Resource of 23.9 million
tonnes at 1.2 g/t for 910,000 ounces, 32% of which is classified as Indicated.
43% of the Mineral Resource (390koz) sits within 100m of surface, increasing confidence for an openpittable production scenario.
Since acquiring the project interest, Marvel has completed 1,544m of diamond drilling which, in
combination with the 2010-2014 drilling, has been included in the current Resource estimate.
Numerous opportunities for resource expansion, with 600m of aircore delineated strike to the northwest (6m at 6.2 g/t gold)1 remaining open.
Mineralisation also remains open to the south-east and at depth with resource expansion drilling
expected to commence in Q4 2020.
The Mineral Resource has been estimated by a leading consultant, with significant experience in
resource estimation at gold projects located in West Africa.
The Mineral Resource was estimated using Multiple Indicator Kriging (MIK) incorporating a change of
support analysis – a method which factors in mining dilution and can be considered a recoverable
resources estimate.
1
ASX announcement 6 August 2020
Table 1: Tabakorole Mineral Resource Estimate (JORC 2012)
Indicated
Inferred
Total
Mt
Au
(g/t)
koz (Au)
Mt
Au
(g/t)
koz
(Au)
Mt
Au
(g/t)
koz
(Au)
Oxide
1.0
1.3
40
1.5
1.3
60
2.4
1.3
100
Fresh
6.3
1.2
250
15.1
1.2
560
21.5
1.2
810
Total
7.3
1.2
290
16.6
1.2
620
23.9
1.2
910
Note: Reported at a cut-off grade of 0.6 g/t Au, differences may occur due to rounding.
Managing Director Phil Hoskins, commenting on the Tabakorole MRE:
“This is a significant improvement in the Mineral Resource for Tabakorole. A 54% increase in ounces
combined with a 20% improvement in grade is an excellent outcome that has exceeded our own expectations.
From the outset, we firmly believed that a revised approach to resource modelling, together with the
incorporation of results of both our recent drilling and historic drilling, presented an opportunity to grow the
Tabakorole Mineral Resource. To have delivered the maiden JORC resource of almost one million ounces of
gold is an exceptional result that has validated our approach and confirmed the opportunity at Tabakorole.
“We have known mineralised strike extensions to follow up whilst the deposit remains open at depth.
Combined with recent transactions that have increased our landholding at Tabakorole to 375km2 and the
demonstrated regional prospectivity, we are confident that further resource growth can be achieved. We
look forward to starting Stage Two drilling in the December Quarter.”
The Tabakorole MRE is defined over a 2.9km strike length with 43% of the resource (390koz) within
approximately 100m of surface. The deposit demonstrates consistently thick zones which indicate the
potential for a relatively low mining strip ratio. Figure 1 shows the Tabakorole MRE in long section by
estimated grades.
2
Figure 1: Tabakorole Mineral Resource Estimate (showing estimated grades)
Reporting Cut-off Grades
The resource is considered amenable to open cut mining and is reported at a cut-off grade of 0.6g/t Au,
which is both statistically robust and consistent with economic cut-off grades applied at other operations in
the region. The final cut-off determination will be dependent on the scale of any potential future operation
and the prevailing gold price. A range of other cut-offs presented in Table 2 demonstrates the grade vs cutoff relationships.
Table 2: Tabakorole Mineral Resource Grade-Tonnage
Indicated
Inferred
Total
Cutoff
Mt
Au
(g/t)
koz
(Au)
Mt
Au
(g/t)
koz
(Au)
Mt
Au
(g/t)
koz
(Au)
0.3
12.6
0.9
370
25.6
0.9
750
38.2
0.9
1,120
0.4
10.7
1.0
350
22.4
1.0
710
33.2
1.0
1,060
0.5
8.9
1.1
320
19.4
1.1
670
28.3
1.1
990
0.6
7.3
1.2
290
16.6
1.2
620
23.9
1.2
910
0.7
5.9
1.4
260
13.8
1.3
560
19.8
1.3
830
0.8
4.9
1.5
240
11.4
1.4
500
16.3
1.4
740
0.9
4.1
1.6
210
9.2
1.5
440
13.2
1.5
660
1.0
3.4
1.8
200
7.4
1.6
390
10.9
1.7
590
3
Opportunities for resource growth
There are numerous opportunities for growing the Tabakorole MRE, including:
Recent aircore drilling has confirmed that gold mineralisation continues at least 600m along strike to
the north-west (including 6m at 6.2 g/t gold)2.
The deposit remains open along strike to the south-east as well as at depth, including several areas
throughout the existing resource that are constrained by lack of drilling.
The south-eastern portion of the deposit is more consistent and of a higher tenor than the north-western
zone and hence represents an outstanding opportunity for the Company to build on the existing Resource.
The consistency and predictability of this zone provides confidence of a very high conversion of ounces from
Inferred into Indicated when infill drilling is conducted. The Company will commence resource expansion
drilling during the December Quarter to test some of the above opportunities.
Furthermore, following the recently announced increase from 100km2 to 375km2 in the Tabakorole
landholding3, the Company intends to advance regional exploration targets where little to no exploration
has been previously conducted. During October, the Company will detail its exploration plans for the
upcoming field season including obtaining multi-element soil geochemistry and ground magnetics as
baseline datasets for regional exploration ahead of further drilling.
The Company will maintain an exploration focus at Tabakorole and defer infill drilling and economic studies
until the scale of the resource is better known. As previously announced, the Company will be undertaking
preliminary metallurgical testwork consisting of cyanide bottle rolls to establish the applicability of
conventional cyanide extraction of gold. The results of this work are expected in the December quarter.
2
ASX announcement 6 August 2020
3 ASX announcement 9 September 2020
4
MINERAL RESOURCE ESTIMATE – TECHNICAL
Project Location and Ownership
The Tabakorole Gold Project is located in southern Mali, approximately 230km south of the capital city of
Bamako (Figure 2). The Project comprises 375km2 of tenure that is accessed via sealed road from Bamako to
Bougouni (170km) followed by an unsealed laterite road from Bougouni to the Project (60km). Mali is a
world-class gold jurisdiction and is the third largest gold producer in Africa.
Figure 2: Location of Tabakorole Gold Project
The Project is subject to a joint venture with UK and TSX-listed Altus Strategies plc (TSX-V: ALTS), with the
Company earning up to an 80% interest in the Project by sole funding expenditure through to completion of
a definitive feasibility study (DFS)4. Completion of the Tabakorole MRE and satisfies the requirements for
the Company to earn its initial 33% interest under the joint venture.
Regional Geology
The project is located within the Baoulé-Mossi domain of southern Mali. This domain is separated into 3
lithostratigraphic units; the North-South striking Birimian volcano-sedimentary series forming the Yanfolila,
Morila and Syama belts, a suite of granitic to monzonitic units which intrude the Birimian volcanosedimentary units and late intrusives which occur as plugs and dykes.
4 ASX announcement 17 June 2020
5
The Tabakorole project is located on what has been known as the Morila belt. The Morila belt occurs within
the major granitic complex of the Bougouni region. The Birimian rocks are comprised of basaltic units
interbedded with volcano-sedimentary units, all of which have undergone amphibolite grade
metamorphism. The major controlling structure in this region is the Bannifin Shear Zone which separates the
Morila belt in the west from the Syama belt in the east and the Tabakorole deposit is interpreted to sit within
a 10km wide, north-west trending structural corridor which is interpreted to represent a splay or splays off
the Bannifin Shear Zone.
Figure 3: Regional Geological Setting of Tabakorole Gold Project
(Map adapted from Parra-Avila et al. 2015)
Local Geology and Mineralisation
The Tabakorole gold project is underlain by Birimian volcanoclastic sedimentary rocks crosscut by a
northwest-trending deformation zone which hosts the mineralised resource. The sedimentary rock units
comprise mostly interbedded dark-grey to greenish-grey fine grained to coarse grained siltstone, wacke and
sandstone units. The units are generally quartz-rich with a matrix composed of fine-grained hydrothermal
alteration minerals such as sericite, chlorite and carbonate. The sedimentary rocks are crosscut by minor
mafic and felsic intrusive rocks. Mafic intrusions are represented by dykes composed of medium to coarse
grained, chloritised amphibole and sericitised plagioclase. The felsic porphyry intrusive unit, which occurs
mainly on the southern portion of the Tabakorole permit, is pale grey in colour and composed of porphyritic
plagioclase within a fine grained siliceous and sericite matrix. The felsic porphyry contains a penetrative
foliation and intense silica, dolomite and sericite hydrothermal alteration.
6
Mineralised zones at Tabakorole are associated with deformation corridors enriched in sulphides that
formed during the various deformation phases. The gold mineralisation consists of disseminated sulphides
and attendant hydrothermal alteration developed in highly strained sedimentary rocks. The mineralisation
typically consists of three to five percent disseminated sulphides; pyrrhotite, pyrite and arsenopyrite with
local chalcopyrite and visible gold. The sulphides are generally fine grained and transposed along the main
fabric with the intensity of deformation being the most valuable cue to mineralisation. The typical alteration
assemblage associated with the auriferous zones is composed of silica, biotite, muscovite and sericite.
Tabakorole Work History
Exploration at Tabakorole dates back to the early 1990s when BHP carried out follow-up soil sampling based
on the preliminary UNDP regional soil sampling program. The project was relinquished by BHP following this
soil sampling program with no further work.
Ashanti Gold Corporation (AGC) undertook further soil sampling during 2001 and completed a 96 hole,
2,182m Rotary Air Blast (RAB) drilling program before relinquishing the property in 2002.
North Atlantic Resources (NAC) acquired the property in July 2003 and undertook an initial drilling program
with the aim of confirming the RAB drilling results obtained by AGC in 2001. A total of fourteen reverse
circulation (RC) drill holes were completed on the southern soil anomalies amounting to 1,261m.
In 2004, NAC completed a soil geochemistry and pitting program as well as a follow-up drilling program
comprised of 75 Aircore (AC) holes and three RC holes for a total of 2,885m and 310m respectively.
NAC commenced the 2005 drilling program with the objective of delineating gold bearing structures below
the newly outlined soil geochemical anomalies. An initial shallow, thirty-metre deep, AC drilling program
was undertaken from January to February. A follow-up RC drilling campaign commenced in May and
continued until August, leading to the initial core drilling program. The drilling program was continuous until
the end of 2005 and a total of 429 AC holes (10,241.5m), 160 RC holes (16,237m) and twenty-six core holes
(6,244.3m) were drilled.
The 2006 drilling program was continuous from January to August, and a NI43-101 Technical Report was
published based on RC and diamond drillholes only up to the end of 2006.
Subsequent to the NI43-101 report, Legend Gold (Legend) assumed control of the licences and three
campaigns of drilling were undertaken by Legend. The first in 2010, consisted of 72 RC holes (6,824m) and 3
diamond drill holes (290m), in 2011 consisting of 48 RC holes for 4,407m and finally in 2014 consisting of 15
RC holes (714m) for a total of 12,230m of drilling that had not been fed into an updated Resource statement.
The exploration database used for Resource Estimation comprises 331 RC boreholes (approximately
32,000m) and 117 diamond drill holes (approximately 30,550m). A total of 96 rotary air blast (RAB) boreholes
and 913 AC holes were included in the database but were not considered for resource estimation other than
to aid in the construction of wireframes used for domaining.
Since acquiring its project interest, Marvel has completed an initial 1,544m diamond drill program which, in
combination with the 2010-2014 drilling, has resulted in the current Resource estimate.
7
Drilling Summary
The orebody can be split into a south-eastern half and a north-western half, with the two separated by a
cross-cutting structure and a zone of lower grade material. In principle, drilling has been conducted on 50m
spaced lines with drill holes spaced 50m apart with the east-west striking portion of the orebody having
received the largest quantum and deepest drilling to date and hence representing the majority of the
material currently classified as Indicated (Figure 4). The deepest drilling in the north-west reached a total
down hole depth of 486m, however the average in this part of the deposit is around 250m. In the southeastern portion of the deposit, the average down hole depth of drilling is around 120m with the deepest
hole achieving a maximum down hole depth of 380m.
In the north-western portion of the deposit, earlier phases of drilling were oriented east-west which is
essentially along the strike of the deposit in this area, however these holes represent the minority of the
drilling metres. Most drilling is oriented towards the north-east, roughly perpendicular to strike (azimuth of
045 and dip of between 50-60 degrees).
In the south-eastern portion of the deposit, drilling has mostly been oriented towards the south-west to
better intersect the known dip of the deposit. The south-eastern portion of the deposit is more consistent
and of a higher tenor than the north-western zone and hence represents an outstanding opportunity for the
Company to build on the existing Resource. Furthermore, due to the consistency and predictability of this
zone, the Company is confident of a very high conversion of ounces from Inferred into Indicated when infill
drilling is conducted.
Figure 4: Tabakorole Mineral Resource Estimate (showing Indicated and Inferred classifications)
Sampling, sub-sampling and assay methodology
The sampling protocols at Tabakorole are generally well established and depend on the type of drilling being
conducted. Diamond drill core samples are generally 1m in length in mineralised material and up to 3m in
unmineralized rocks, with the actual sample length selected taking into account both structural and
8
lithological breaks as recorded by the geologist. RC samples are more uniformly 1m in mineralised material
and 3m in unmineralized material.
Diamond core is sawn using a diamond blade and half core submitted to the laboratory whilst RC samples
are collected in full and then riffle split through a 3-tier riffle splitter yielding approximately 1/8th of the
sample mass collected at the cyclone. Weights of both sample types are routinely recorded and recovery of
diamond core is estimated by measuring the length of core collected divided by the run length recorded by
the driller. Ground conditions at Tabakorole are generally good and hence core recovery and RC recovery
weights are usually good.
Sample preparation consists of crushing to -3mm before splitting to achieve a sample weight of 4-500g for
pulverisation. This sample is pulverised to achieve a grind of 95% passing 75µm. A 50g pulp sample is then
taken for analysis by Fire assay with atomic absorption spectrometry (AAS) finish.
QAQC material has routinely been submitted and includes Certified Reference Material, Blanks and
Duplicates with a total volume of around 10% of total samples submitted. QAQC data is regularly reviewed
as a function of the Company database management procedure.
Geological Modelling
The geological interpretation for the mineralised area was compiled by analysing all available relevant data,
including geological logging, lithology and structure and gold assay, as well as interpretation of
aeromagnetic, EM and IP geophysical data.
Mineralisation at the project is associated with a shear zone and is hosted within a banded gneiss sequence.
Proximal to the gneissic sequence are occurrences of small mafic dykes and felsic veins and these are mostly
difficult to correlate between adjacent drillholes. Gabbro may also be locally well developed as is a diorite
unit. There are no outcrops of bedrock locally and saprolite is well developed to a depth of 15m to 30m. A
laterite hard cap is locally well developed.
The geological model was utilised as a guide in the construction of wireframes in Vulcan three-dimensional
modelling software as input to the resource modelling.
Mineral Resource Estimation
A summary of the material information used to estimate the mineral resource is presented in accordance
with JORC 2012 requirements.
The Mineral Resources reported here represent Mineral Resources that were estimated for the Tabakorole
gold deposit using the methodology as described below and in Appendix 1. Indicated and Inferred categories
of mineralisation have been defined and are reported here as Mineral Resources.
Estimation Methodology
Multiple Indicator Kriging (MIK) with change of support was selected as the most appropriate method for
estimating Au for the Tabakorole deposit. A total of two grade estimate domains have been developed
within the mineralised zones and based on the geological description in the previous sections and an
approximate lower cut-off grade of 0.3 g/t Au.
A block size of 20mE x 25mN x 10mRL was selected as an appropriate block size for estimation based on the
drill spacing (50m strike spacing or better), geometry of mineralisation and the likely potential future
selective mining unit or SMU (i.e. appropriate for potential open pit mining). An SMU dimension of
9
5mE x 12.5mN x 5mRL was selected as appropriate for support correction investigation. An indirect
lognormal support correction was applied to emulate mining selectivity for the above SMU dimension.
The MIK grade estimates consist of a series of proportions and grades above the pre-defined cut-off grades
estimated into a ‘panel’ or large blocks. The proportions and grades are derived from a targeted SMU block
size via change of support process. As such, while the proportions and grades at a certain cut-off for any
given panel may be known, its position within the panel is not. To assist with a more intuitive presentation
of the model grades, the MIK grade estimates have been localised to SMU dimension blocks using a process
identical to that of Localised Uniform Conditioning. The SMU sized blocks have been assigned a single grade
so that the panel MIK grade estimate grade tonnage curve has been replicated.
Drill Hole Flagging, Compositing, Top Cuts and Variography
Raw sample intervals from the drill hole database were flagged by the estimation domains and composited
to 2m downhole intervals for the purposes of equalising sample support and as an input to grade estimation.
The impact of higher-grade gold outliers was examined on composite data using log probability plots and
cumulative statistics. This is particularly relevant in the case where extreme grade values may exist, however
MIK estimation as implemented at Tabakorole is independent of top cutting and was therefore not applied
to the final grade estimate.
Grade and indicator variography were developed based on the downhole composites. Indicator variography
was input to the MIK estimates while grade variography was used for the change of support analysis applied
to the MIK estimates.
Mining and Metallurgical Parameters and Other Material Modifying Factors
The proposed development scenario for the deposit is as an open cut (pit) mine. No additional mining
dilution has been applied to the reported estimate.
Very limited metallurgical test work has been done and this was only completed on oxide material. The test
work was carried out by Peacocke and Simpson in Zimbabwe in October 2015 on a 100kg sample collected
using auger drilling over an area of 20 x 25m centred around hole 06TKDDH-059. This unoptimized test work
yielded a total of 90.6% recovery using a conventional cyanidation process. Due to the limited coverage and
selective nature of sampling, the results from this test work are not considered representative of the deposit.
The Company plans to complete a preliminary program of metallurgical test work using material collected
from drill core in the future.
No other additional modifying factors have been considered as part of this Resource estimate.
Mineral Resource Constraints
The Mineral Resource at Tabakorole represents a global resource and has not been constrained by an
optimised pit shell or similar. This is considered appropriate for the current level of understanding and
development of the Mineral Resource.
10
Classification
Resource classification was based on geological confidence and a spatial review of estimation result
parameters which reflected the quality of the estimate for each block. At the Tabakorole deposit, areas that
had high confidence estimate values, had sufficient drilling density (≤50m section spaced drilling) or were
proximal to 50m spaced drill lines were classified as Indicated Resources. The remainder was classified as
Inferred.
Figure 5: Tabakorole Mineral Resource Estimate (showing Indicated and Inferred Classifications)
This announcement has been approved for release by the Board.
PHIL HOSKINS
Managing Director
For further information, please contact:
Phil Hoskins – Managing Director
Tel: +61 8 9200 4960
Chris van Wijk – Executive Director, Exploration
Tel: +61 8 9200 4960
For more information, visit www.marvelgold.com.au.
11
Competent Person’s Statement
The information in this report that relates to the Mineral Resources is based on information compiled by Mr Brian Wolfe, Principal
Consultant of International Resource Solutions Pty Ltd which provides consulting services to the Company. Mr. Wolfe is a Member
of the Australian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation and types
of deposits under consideration and to the activity which has been undertaken to qualify as a Competent Person as defined in the
2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). An
entity associated with Mr Wolfe has a minor shareholding in the company. Mr. Wolfe consents to the inclusion in the presentation
of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to exploration results at Tabakorole is based on information compiled by the
Company and reviewed by Mr Chris van Wijk, in his capacity as an Executive Director and Exploration Manager of Marvel Gold
Limited. Mr. van Wijk is a Member of the AUSIMM and has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in
the 2012 JORC Code. Mr. van Wijk consents to the inclusion in the report of the matters based upon the information in the form
and context in which it appears
12
About Marvel Gold
Marvel Gold Limited is an Australian resources company listed on the Australian Securities Exchange under
stock code MVL. Marvel Gold is a Mali-focused gold explorer with advanced gold exploration projects and
extensive landholdings in South and West Mali.
The Tabakorole Gold Project has a large existing resource with opportunities to expand along strike and via
regional exploration. The Lakanfla Gold Project is a major untested gold target 6km from the Sadiola gold
mine. Marvel Gold has an experienced board and management team with specific skills, and extensive
experience, in African based exploration, project development and mining.
Figure 6: Marvel Gold, Mali Projects Location
13
Reference to previous ASX announcements
The information in this announcement that relates to previously reported exploration results at Tabakorole
was announced on the 17th of June 2020, 6th of August 2020 and 17th of August 2020. Marvel confirms that
it is not aware of any new information or data that materially affects the information included in those
announcements.
JORC TABLE 1 REPORTING
Section 1. Sampling Techniques and Data
Criteria
Sampling
Techniques
Drilling
techniques
Drill Sample
Recovery
Logging
Explanation
Nature and quality of sampling (eg
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
Commentary
Core assay samples were collected on half core sawed lengthwise with a diamond
saw. Sampling intervals were marked by an appropriately qualified geologist
depending on geology. Sampling intervals vary between 0.3 and 5 metres in length
with an average of 1 metre in mineralisation.
Reverse circulation samples are collected directly from the drill rig cyclone at 1
metre intervals and composited into 2 metre samples. Each sample is split with a
mechanical rifle splitter to yield an assay sample of approximately five kilograms in
weight. The sub-sample is marked and bagged on site.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
Core samples are selected based on geological criteria (presence of quartz veining
and sulphide mineralisation). Sample lengths are between 0.3 and 1.2m in
mineralisation and may be up to 3m in unmineralised material. Core samples are
crushed to -3mm, split and a 250g sub-sample is pulverised with gold determined
by fire assay/AAS based on a 30g charge.
RC drilling was completed using a face sampling bit to drill a hole of 125mm in
diameter. Holes were drilled with a dip of between 45 and 60 degrees and oriented
roughly perpendicular to mineralisation where possible.
Diamond drilling was conducted using HQ (63mm in diameter) in weathered
material and then reduced to NQ (40mm in diameter) in fresh rock. Holes were
drilled with a dip of between 45 and 60 degrees and oriented roughly perpendicular
to mineralisation. 2020 Diamond drill core was oriented using a Reflex ACT II core
orientation tool.
Drill hole recoveries were recorded during logging by measuring the length of core
recovered per 3m core run. Core recovery was calculated as a percentage recovery
of actual core length divided by expected core length.
RC weights have been collected to monitor recovery but no recovery calculations
for RC drilling have been calculated.
Core recovery was routinely measured and monitored and RC sample weights were
recorded and monitored in order to calculate sample recoveries. There is no known
relationship between recovery and grade.
Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter,
triple or standard tube, depth of
diamond tails, face-sampling bit or
other type, whether core is oriented
and if so, by what method, etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential
loss/gain of fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
All recovered geological material (RC chips and drill core) is logged onsite by
geologists to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Logging of drill core is qualitative and records colour, grain size, texture, lithology,
weathering, structure, strain intensity, alteration, veining and sulphides.
Geotechnical logging records core recovery, RQD, fracture counts and fracture sets.
Density measurements are recorded for each core box using standard dry/wet
14
Criteria
Sub-Sampling
techniques
and sample
preparation
Explanation
The total length and percentage of
the relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core
taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality
of
assay
data
and
laboratory
tests
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
instance
re
Share your feedback
Discover