Drilling results expected to upgrade Tabakorole resource
Released
Released
Announcement PDF
2 March 2021
FURTHER TABAKOROLE DRILL RESULTS EXPECTED TO UPGRADE
RESOURCE
HIGHLIGHTS
Three holes (totalling 512m) drilled within the existing strike of the deposit have returned intersections
of high-grade mineralisation which are expected to materially enhance the existing 910koz mineral
resource1.
Hole 21TBKRC-005 intersected:
12m at 2.1 g/t gold from 18m;
18m at 1.9 g/t gold from 53m; and
10m at 1.5 g/t gold from 97m.
Hole 21TBKRC-006 intersected:
3m at 2.0 g/t gold from 10m;
22m at 1.8 g/t gold from 77m; and
11m at 0.7 g/t gold from 141m.
Samples for 28 RC drill holes (3,903m) remain with the laboratory, with assay results expected
imminently.
Marvel Gold Limited (ASX: MVL) (Marvel or the Company) is pleased to provide further results from the
resource expansion drill program at the Tabakorole Gold Project (Tabakorole or the Project), located in
southern Mali. The results, shown further in Figures 2 and 3, are expected to materially enhance the resource
ounces and grade within this portion of the deposit where historical results encountered nearer surface
were lower grade than those intersected in the current program.
Managing Director, Phil Hoskins, commented: “We are extremely pleased with the thickness and grades of
these drill results. The focus of this drill program was resource expansion, with the majority of the holes
testing strike extensions. A number of holes were planned within the existing strike to improve the resource
and there is no doubt that these drill holes have accomplished that.”
The mineralisation encountered in these three holes is a significant improvement to what has been modelled
in this area in both thickness and grade. Previously modelled intercepts in this area exist within a broad halo
of low-grade mineralisation which surrounds the deposit. These holes were targeted as this area was
previously sparsely drilled, with only a single hole per section and there were indications from historical
drilling along strike that the grades improved with depth, as has now been shown by the current results.
Importantly, these results are near surface and viable within an open pit mining scenario.
The Company is awaiting results from a further 3,903m across 28 holes including drilling expected to confirm
the north-west strike extension of the Tabakorole resource. The Company is currently undertaking a five
hole, 750m diamond drilling program in the south-east of the deposit and following up with an aircore
program to the south-east of the deposit to further target the strike potential in this area.
1.
ASX announcement 30 September
Figure 1: Plan view showing results from Tabakorole resource expansion drill program
Figure 2: Cross-section showing hole 20TBKRC-005
2
Figure 3: Cross-section showing hole 20TBKRC-006
This announcement has been approved for release by the Board.
PHIL HOSKINS
Managing Director
For further information, please contact:
Phil Hoskins – Managing Director
Tel: +61 8 9200 4960
Chris van Wijk – Executive Director, Exploration
Tel: +61 8 9200 4960
For more information, visit www.marvelgold.com.au.
REFERENCE TO PREVIOUS ASX ANNOUNCEMENTS
In relation to the announcement of the Tabakorole Mineral Resource estimate on 30 September 2020, the
Company confirms that it is not aware of any new information or data that materially affects the information
included in that announcement and that all material assumptions and technical parameters underpinning
the Mineral Resource in that announcement continue to apply and have not materially changed.
In relation to the previously reported exploration results shown in Figure 1, these were included in the
announcement dated 18 February 2021. The Company confirms that it is not aware of any new information
or data that materially affects the information included in that announcement.
3
In relation to the previously reported exploration results in Figures 2 and 3 (Holes 10TKRC-05 and 10TKRC07), these were included in the announcement dated 17 June 2020. The Company confirms that it is not
aware of any new information or data that materially affects the information included in that
announcement.
COMPETENT PERSON’S STATEMENT
The information in this announcement that relates to exploration results at Tabakorole is based on
information compiled by Company geologists and reviewed by Mr Chris van Wijk, in his capacity as an
Executive Director and Exploration Manager of Marvel Gold Limited. Mr. van Wijk is a Member of the
AUSIMM and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the 2012 JORC Code. Mr. van Wijk consents to the inclusion in the report of the matters based upon the
information in the form and context in which it appears.
About Marvel Gold
Marvel Gold Limited is an Australian resources company listed on the Australian Securities Exchange under
stock code MVL. Marvel Gold is a Mali-focused gold explorer with advanced gold exploration projects and
extensive landholdings in South and West Mali.
The Tabakorole Gold Project has an existing Mineral Resource (910,000oz grading 1.2 g/t gold)1, with
opportunities to expand along strike and via regional exploration. The Lakanfla Gold Project is a prospective
license with artisanal gold workings and existing gold mineralisation located 15km from the Sadiola gold
mine.
Marvel also owns 100% of the Chilalo Graphite Project, a world-class fully permitted graphite project in
south-east Tanzania. With expenditure to date exceeding A$21M, a completed DFS and a management team
with substantial graphite market knowledge and IP, Chilalo has the potential for near-term development.
The Company is currently assessing all options for this asset including a possible demerger and IPO.
Marvel Gold has an experienced board and management team with specific skills, and extensive experience,
in African based exploration, project development and mining.
4
Marvel Gold Project Location Map
Mali Gold Projects
Tanzanian Graphite Project
5
APPENDIX 1. DRILL HOLE INFORMATION
Significant intercepts have 0.5g/t cutoff, minimum length of 3m and 5m max internal waste. Previously
reported drillholes from the current program are shown in grey.
Prospect
HoleID
Hole
Type
East
WGS84
North
WGS84
RL
Dip
Azi
EOH
Depth
Depth
From
Depth
To
Width
(m)
Grade
Au g/t
Tabakorole
20TBKRC001
RC
673,291
1,198,706
356
-60
220
160
101
104
3
0.74
Tabakorole
20TBKRC002
RC
672,671
1,199,122
357
-60
220
160
13
37
24
1.24
Tabakorole
20TBKRC002
RC
672,671
1,199,122
357
-60
220
160
46
50
4
0.44
Tabakorole
20TBKRC002A
RC
672,667
1,199,119
356
-60
220
159
4
29
25
0.81
Tabakorole
20TBKRC002A
RC
672,667
1,199,119
356
-60
220
159
60
66
6
0.35
Tabakorole
20TBKRC003
RC
672,652
1,199,139
359
-60
220
150
17
31
14
0.83
Tabakorole
20TBKRC003
RC
672,652
1,199,139
359
-60
220
150
85
88
3
0.59
Tabakorole
20TBKRC003
RC
672,652
1,199,139
359
-60
220
150
100
103
3
0.55
Tabakorole
20TBKRC004
RC
672566.52
1199239.59
358
-60
220
200
25
28
3
0.79
Tabakorole
20TBKRC004
RC
672566.52
1199239.59
358
-60
220
200
38
41
3
1.82
Tabakorole
20TBKRC004
RC
672566.52
1199239.59
358
-60
220
200
106
127
21
0.94
Tabakorole
20TBKRC005
RC
672465.64
1199273.58
358
-60
220
153
18
30
12
2.13
Tabakorole
20TBKRC005
RC
672465.64
1199273.58
358
-60
220
153
53
71
18
1.94
Tabakorole
20TBKRC005
RC
672465.64
1199273.58
358
-60
220
153
97
107
10
1.55
Tabakorole
20TBKRC006
RC
672401.31
1199345.7
360
-60
220
159
10
13
3
2
Tabakorole
20TBKRC006
RC
672401.31
1199345.7
360
-60
220
159
56
64
8
0.71
Tabakorole
20TBKRC006
RC
672401.31
1199345.7
360
-60
220
159
77
99
22
1.84
Tabakorole
20TBKRC006
RC
672401.31
1199345.7
360
-60
220
159
141
152
11
0.67
Tabakorole
20TBKRC007
RC
671,533
1,199,519
355
-60
0
123
PENDING ASSAYS
Tabakorole
20TBKRC008
RC
671,530
1,199,482
360
-60
0
180
PENDING ASSAYS
Tabakorole
20TBKRC009
RC
671,426
1,199,549
364
-60
0
85
PENDING ASSAYS
Tabakorole
20TBKRC010
RC
671,390
1,199,565
351
-60
0
81
PENDING ASSAYS
Tabakorole
20TBKRC011
RC
671,391
1,199,503
352
-60
0
135
PENDING ASSAYS
Tabakorole
20TBKRC012
RC
671,330
1,199,544
351
-60
0
120
PENDING ASSAYS
Tabakorole
20TBKRC013
RC
671,333
1,199,502
349
-60
0
159
PENDING ASSAYS
Tabakorole
20TBKRC014
RC
671,263
1,199,602
344
-60
0
123
PENDING ASSAYS
Tabakorole
20TBKRC015
RC
671,268
1,199,538
348
-60
0
159
PENDING ASSAYS
Tabakorole
20TBKRC016
RC
671,189
1,199,533
342
-60
0
201
PENDING ASSAYS
Tabakorole
20TBKRC017
RC
671,027
1,199,596
347
-60
0
105
PENDING ASSAYS
Tabakorole
20TBKRC018
RC
670,990
1,199,588
341
-60
0
105
PENDING ASSAYS
Tabakorole
20TBKRC019
RC
670,951
1,199,601
343
-60
0
105
PENDING ASSAYS
Tabakorole
20TBKRC020
RC
670,913
1,199,587
352
-60
0
100
PENDING ASSAYS
Tabakorole
20TBKRC021
RC
670,914
1,199,550
351
-60
0
159
PENDING ASSAYS
Tabakorole
20TBKRC022
RC
673,077
1,198,926
364
-60
220
200
PENDING ASSAYS
Tabakorole
20TBKRC023
RC
670,952
1,199,549
340
-60
0
160
PENDING ASSAYS
Tabakorole
20TBKRC024
RC
673,691
1,198,292
349
-60
215
171
PENDING ASSAYS
Tabakorole
20TBKRC025
RC
670,985
1,199,549
346
-60
0
153
PENDING ASSAYS
Tabakorole
20TBKRC026
RC
671,025
1,199,545
339
-60
0
150
PENDING ASSAYS
Tabakorole
21TBKRC001
RC
673,715
1,198,318
353
-60
215
201
Tabakorole
21TBKRC002
RC
673,762
1,198,251
354
-60
215
153
NSI
Tabakorole
21TBKRC003
RC
673,810
1,198,202
353
-60
215
150
NSI
Tabakorole
21TBKRC005
RC
673,286
1,198,670
360
-60
240
126
PENDING ASSAYS
Tabakorole
21TBKRC006
RC
673,781
1,198,169
350
-60
215
117
NSI
Tabakorole
21TBKRC007
RC
673,723
1,198,212
346
-60
215
100
PENDING ASSAYS
178
201
23
2.00
6
Prospect
HoleID
Hole
Type
East
WGS84
North
WGS84
RL
Dip
Azi
EOH
Depth
Depth
From
Depth
To
Width
(m)
Tabakorole
21TBKRC008
RC
673,784
1,198,287
346
-60
215
195
PENDING ASSAYS
Tabakorole
21TBKRC010
RC
673,076
1,198,888
362
-50
200
153
PENDING ASSAYS
Tabakorole
21TBKRC011
RC
673,661
1,198,259
352
-60
220
111
PENDING ASSAYS
Tabakorole
21TBKRC012
RC
673,459
1,198,449
353
-55
220
87
PENDING ASSAYS
Tabakorole
21TBKRC013
RC
671,105
1,199,586
346
-60
0
150
PENDING ASSAYS
Tabakorole
21TBKRC014
RC
671,098
1,199,552
341
-60
0
207
PENDING ASSAYS
Grade
Au g/t
APPENDIX 2. JORC TABLE 1 REPORTING
Section 1 - Sampling Techniques and Data
Criteria
Sampling
Techniques
Drilling
techniques
Drill Sample
Recovery
Logging
Sub-Sampling
techniques
and sample
preparation
Explanation
Nature and quality of sampling (eg
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
Commentary
Reverse circulation samples are collected directly from the drill rig cyclone at 1
metre intervals. Samples were riffle split using a 4-tier riffle splitter to yield an assay
sample of approximately five kilograms in weight. The sub-sample is marked and
bagged on site.
Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter,
triple or standard tube, depth of
diamond tails, face-sampling bit or
other type, whether core is oriented
and if so, by what method, etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
RC drilling was completed using a face sampling bit to drill a hole of 125mm in
diameter. Holes were typically drilled with a dip of between 60 degrees to try and
intersect mineralisation at a high angle.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential
loss/gain of fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of
the relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core
taken.
RC sample weights were recorded and monitored in order to calculate sample
recoveries. No relationship between sample weight and grade is known.
All samples are prepared by MSA labs in Cote d’Ivoire who are an independent
laboratory. Samples are crushed to -3mm, split and a 250g sub-sample is pulverised
with gold determined by fire assay/AAS based on a 30g charge.
RC sample weights have been collected to monitor recovery but no recovery
calculations for RC drilling have been completed.
All sample material is logged onsite by geologists to a level of detail to support
appropriate Mineral Resource estimation, mining studies and metallurgical studies.
Logging is qualitative and records colour, grain size, texture, lithology, weathering,
alteration, veining and sulphides. Chip trays are prepared by collecting
representative material from each metre sample and photographed.
All drill holes are logged in full.
Not applicable – no core drilling conducted.
7
Criteria
Quality
of
assay
data
and
laboratory
tests
Verification of
sampling and
assaying
Location of
data points
Data spacing
and
distribution
Explanation
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
instance
results
for
field
duplicate/second-half sampling.
The
nature,
quality
and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
Commentary
RC samples were dry and sampled directly from the cyclone through a riffle splitter.
Sample preparation consisted of jaw crushing to -3mm, splitting 500 grams and
pulverizing to 95% passing 75µ. A sub-sample of 150-200g (pulp sample) is retained
for analysis.
The sample preparation procedures carried out are considered industry standard.
RC Samples: Field duplicates, Blanks and CRM are inserted at a rate of 1:30 which
is considered industry best practice.
Field Duplicates are the primary means of ensuring representativeness of sampling.
Duplicates, blanks and Certified Reference Materials have been used to ensure
assay quality and representativeness of sampling.
All samples were assayed for gold by fire-assay with AAS finish by MSA Laboratories
in Yamassoukro, Côte d’Ivoire. This is considered to be a total analysis for Gold.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and
model,
reading
times,
calibrations factors applied and their
derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates,
external
laboratory
checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
The instruments employed to collect ground magnetics at Tabakorole include 3 x
GSM-19W v 7.0 Overhauser magnetometers with Novatel OEMSTAR GPS on board.
A GEM GMS-19 base station was used for survey control. Readings were taken
continuously and base station measurements were on a 10 second interval. The
data collection was contracted to SAGAX Afrique who are the owners of the
geophysical equipment and a recognised independent contractor with a long
history in the region.
Field duplicates, Blanks and CRM are inserted at a rate of 1:30 which is considered
industry best practice.
The verification of significant
intersections by either independent
or alternative company personnel.
The use of twinned holes.
All assays are reviewed by the Competent Person and significant intercepts are
calculated as composites >0 5g/t Au with a minimum width of 3m and up to 5m
internal dilution.
No twin holes have been drilled. One hole: TBKRC-002A is a redrill of TBKRC-002 as
this first hole failed to reach the target depth.
All drill hole logging was entered into standardised spreadsheets at the rig before
verification and importation into a Datashed database, administered in Perth,
Western Australia.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used
to locate drill holes (collar and downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic
control
Data spacing for
Exploration Results.
reporting
of
Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the
Mineral Resource and Ore Reserve
estimation
procedure(s)
and
classifications applied.
No assay data was adjusted, and no averaging was employed
Drill hole collars were located using handheld GPS with 3-5m accuracy and initial
Dip and Azimuth determined using a handheld compass. A Reflex EZ Shot has been
used for downhole surveys.
All results reported use WGS84 UTM Zone 29.
Not Applicable.
Drill hole spacing is variable as this is a reconnaissance drill program.
The drill hole spacing is variable in the current program, however all holes drilled
in the current program are expected to be incorporated into the next resource
update at Tabakorole.
8
Criteria
Explanation
Whether sample compositing has
been applied.
Commentary
Samples have not been composited in this program.
Orientation
of data in
relation to
geological
structure
Drill holes have been oriented with a dip of 60 degrees to try to intercept the
mineralisation at a high angle. It is unlikely that the orientation of drilling has biased
the results in the current program.
Sample
Security
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
If the relationship between the
drilling
orientation
and
the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure
sample security.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
No audits have been conducted.
No bias between drilling orientation and the orientation of key structures is known.
Samples were stored on site in the field camp until despatch. Samples were bagged
and consolidated into sacks secured with zip ties. A transport company contracted
by the laboratory was used to collect the samples and transport them by road to
the laboratory in Cote d’Ivoire. A chain of custody was maintained at all times.
Section 2 - Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
Explanation
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Commentary
Legend Gold Mali SARL is the 100% owner of the Tabakorole licence.
Exploration
done by other
parties
Geology
Acknowledgment and appraisal of
exploration by other parties.
Not applicable to this announcement. See ASX announcement of 17 June 2020 for
information on exploration done by other parties.
Deposit type, geological setting and
style of mineralisation
The Tabakorole ore deposit as it is currently recognised is an orogenic,
hydrothermal gold deposit with much in common with other volcano-sedimentary
hosted Birimian style orogenic gold deposits throughout the region.
Drill
hole
information
A summary of all information
material to the understanding of the
exploration results including a
tabulation
of
the
following
information for all Material drill
holes:
All relevant drill hole details are provided in the body text and Figures of this
announcement.
The Tabakorole permit was granted under Arrêté N°2015-1823 on the 25th of June
2015 and renewed on the under Arrêté N°2018-3538 on the 8th of October 2018
(First renewal). The permit is currently undergoing its second renewal which was
lodged with the DNGM on 25th of February 2020.
The licence was confirmed to be in good standing as of the 20th of September 2019
via letter of Attestation from the Malian DNGM. Subsequent due diligence carried
out by independent specialists engaged by the Company confirmed that the licence
is in good standing.
o easting and northing of the
drill hole collar
o elevation or RL (Reduced
Level – elevation above sea
level in metres) of the drill
hole collar
o dip and azimuth of the hole
o down hole length
interception depth
and
o hole length.
9
Criteria
Data
aggregation
methods
Relationship
between
mineralisation
widths
and
intercept
lengths
Explanation
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high
grades) and cut-off grades are usually
Material and should be stated.
Commentary
Significant intercepts are determined above a 0.5g/t Au cutoff grade with minimum
3m intercept and no more than 5m of internal dilution. No top cuts have been
applied.
Where
aggregate
intercepts
incorporate short lengths of highgrade results and longer lengths of
low-grade results, the procedure
used for such aggregation should be
stated and some typical examples of
such aggregations should be shown
in detail.
As above.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
No metal equivalents are reported.
These relationships are particularly
important in the reporting of
Exploration Results.
All intercepts reported as downhole lengths. True widths have not yet been
determined.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be
reported.
If it is not known only the down hole
lengths are reported, there should be
a clear statement to this effect (eg
‘down hole length, true width not
known’).
Diagrams
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These
should include, but not be limited to
a plan view of drill hole collar
locations and appropriate sectional
views.
See body of announcement for diagrams.
Balanced
reporting
Where comprehensive reporting of
all Exploration Results is not
practicable, representative reporting
of both low and high grades and/or
widths should be practiced to avoid
misleading reporting of Exploration
Results.
Balanced reporting has been applied. All holes are reported in full.
Other
substantive
exploration
data
Other exploration data, if meaningful
and material, should be reported
including (but not limited to):
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical
test
results;
bulk
density,
groundwater, geotechnical and rock
characteristics; potential deleterious
or contaminating substances.
All applicable geological observations have been reported at this time.
Further work
The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
A Diamond drilling and Aircore program commenced in February 2021.
10
Criteria
Explanation
Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
Commentary
11
Share your feedback
Discover