DRILLING CONFIRMS KARST TARGET AT LAKANFLA
Marvel Gold Limited (ASX: MVL) (Marvel or the Company) is pleased to provide an update on the current
drilling program at its Lakanfla Gold Project (Lakanfla) located in western Mali.
The objectives of this first phase drilling program were to:
i.
Prove the existence of the karst and outline the stratigraphy – successfully confirmed;
ii.
Define the shape and depth of the karst – ongoing; and
iii.
Identify the potentially mineralised areas of the karst – subject to assays.
Drilling commenced earlier this month, with 8 holes for 1,653m out of a planned total of approximately
3,800m completed to date. Due to the distance from the laboratory and the associated logistics of
transporting the mass of samples collected during the program, the Company plans to despatch all samples
at the conclusion of drilling (now expected to be mid-November). As such, the Company expects results to
be reported throughout December.
Encouragingly, the majority of holes drilled to date have intercepted karst horizons. Karst horizons were
found at various depths and thickness, some within the first 60 metres from surface and up to 60 metres
thick. The presence of karsts (as a result of dissolution of carbonate rocks) explain the extensive gravity lows
seen at Lakanfla and are an important proof of concept because the dissolution is thought to be responsible
for upgrading lower level gold into a potentially economic supergene enrichment zone. More detailed
descriptions of the geology are included in the technical section further below.
Executive Director Chris van Wijk, commenting on the drilling progress:
“We are encouraged that the rock types encountered by drilling to date have confirmed the presence of a
karst at Lakanfla. This is the first critical step in the Lakanfla deposit model being pursued by Marvel. Our
remaining holes are spaced around the 7km strike of gravity lows that we now know exist due to karst
formation and carbonate rock dissolution processes. We await the assay results in December to confirm
whether these extensive karst horizons are mineralised.”
The next step is assays from the drill program to confirm if the karsts are mineralised. There are a number
of reasons to be optimistic about the mineralisation potential at Lakanfla:
•
It is located 6km from Sadiola, one of Mali’s largest gold deposits;
•
It is located on the Senegal Mali Shear Zone, a structure responsible for a substantial number of largescale gold deposits;
•
There are extensive artisanal workings targeting high-grade veinlets in metasediments to the northwest of Target Zone 1 (see Figure 4 further below); and
•
The granite intrusion is mineralised, having been the focus area of historical drilling.
DRILL PROGRAM AND FINDINGS – TECHNICAL
Figure 1 below shows the location of the actual and planned drillholes including holes 20LKFRC005 and
20LKFRC002, which are described in more detail below.
Figure 1: Lakanfla drillhole locations*
*In relation to the exploration results shown in Figure 1, see ASX announcement 17 June 2020.
Most holes drilled thus far have intercepted karst horizons which typically manifest as voids within a
(carbonaceous) siltstone-mudstone unit that have been infilled with weakly consolidated to unconsolidated,
compositionally and texturally immature sediments interbedded with clay-rich bands (collectively known as
‘karst fill’).
The karst fill is strongly weathered and oxidised, contrasting sharply with the in-situ bedrock. When drilling
through the karsts, vast amounts of water have been encountered. The base of the karst typically consists
of ‘bleached’ or saprolitic (carbonaceous) siltstone-mudstone, which freshens with depth. The top of the
karst fill often has a ferruginous layer, whilst pisoliths have also been observed at depth (e.g. from 48-50m;
hole 20LKFRC005). Pisoliths are exclusively formed in the near-surface environment and their occurrence at
2
depth is therefore considered irrefutable proof of karst fill. In the deeper portions of some holes, the in-situ
(carbonaceous) siltstone-mudstone unit is weakly sericite altered and pyrite-bearing.
The karsts exist due to dissolution and collapse of carbonate-bearing units at Lakanfla which produces a halo
of lower density material around the granodiorite intrusion, represented by the gravity lows observed in the
data. As these rocks have dissolved and collapsed over time, the resulting voids have been infilled with
transported sands and material shedding from the weathering of the intrusion.
The intrusion is thought to play a role in mineralisation, both as a source of metals and fluids which alter the
country rocks. The dissolution of carbonates is thought to be one of the processes by which low-level gold
introduced by these intrusions can be upgraded to potentially economic levels.
Figure 2 below shows the typical lithologies in drillhole 20LKFRC005. Note pisoliths in karst fill from 48-50m
(see inset image). The karst is from approximately 36m – 114m (between the red lines), noting that this is
not just one void, but a series of voids with some intervals of in situ siltstone, and some possible karst fill
intervals after 114m.
Figure 2: RC chips from Hole 20LKFRC005
Figure 3 below shows hole 20LKFRC002 from 120-180m. Karst fill is interpreted from 128-165m. Note how
128-129m is highly ferruginous (which is frequently observed in other drilling) and that the top of the in situ
sediment is strongly bleached, gradually passing into fresher rock. Karst fill consists of clay intervals and
granite-derived detrital quartz grains; these are interpreted to have been washed into the karsts as locallysourced colluvium and weathered in situ. No fresh granite has yet been intersected by the drilling.
3
Figure 3: RC chips from Hole 20LKFRC002
Figure 4: Extensive artisanal workings to the NW of Target Zone 1 (drone view)
~500m
4
ABOUT LAKANFLA
The Lakanfla Gold Project is located in the Kenieba inlier of western Mali, adjacent to the northern section
of the gold-rich Senegal Mali Shear Zone. The project lies 6km to the south-east of the tier 1 Sadiola gold
mine (13.5Moz production historically) and 35km south-east of the Yatela gold mine (4.5Moz production
historically).
Figure 5: Location of Lakanfla Project
Lakanfla hosts a significant number of active and historic artisanal gold workings which are coincident with
major geochemical and gravity anomalies. Significantly, there is evidence of ground collapse at surface, as
well as extensive voids and anomalous stratigraphy in drilling which are indicative of karst style dissolution
at depth within mapped carbonate rock units.
Karstification occurs when soluble carbonate bearing units, for example limestones, dolomites or marbles
are dissolved. The residuum left behind may be comparatively upgraded in certain insoluble minerals, in this
case, the element of interest being gold. This is one of the processes of supergene enrichment.
This model is geologically analogous to the 4.5Moz Yatela deposit some 35km to the north-west and also the
Sadiola FE3 and FE4 pits which are around 3km to the north-west of the license boundary.
Historical drilling at Lakanfla has returned encouraging intersections including 26m at 5.1 g/t gold from 32m
and 18m at 4.3 g/t gold from 34m (ASX announcement 17 June 2020). In addition, several drillholes have
intersected voids and unconsolidated sand at depths of up to 150m below surface. However, none of the
priority gravity low targets have been systematically drill tested.
Of the historical drilling that has been undertaken at Lakanfla, 35 holes coincide with the priority targets,
however the majority of these holes were drilled no deeper than 75m vertical depth and the exploration
5
target is expected to be below this stratigraphic level at the bedrock-weathering interface. In comparison
with the nearby large scale Yatela deposit, which is a direct exploration analogue, mineralisation was
encountered at depths up to 220m below surface and as such, the Company believes that a valid exploration
target of this style exists at Lakanfla. Figure 6 below illustrates the potential location of the mineralisation
within the karst target.
Figure 6: Schematic cross-section of Lakanfla geology and target zones
The Company understands that the Sadiola gold mine will require additional oxide feed in the relative near
term. Given Lakanfla’s proximity to the Sadiola processing plant, any discovery would be significant for the
Company.
This announcement has been approved for release by the Board.
PHIL HOSKINS
Managing Director
For further information, please contact:
Phil Hoskins – Managing Director
Tel: +61 8 9200 4960
Chris van Wijk – Executive Director, Exploration
Tel: +61 8 9200 4960
For more information, visit www.marvelgold.com.au.
6
About Marvel Gold
Marvel Gold Limited is an Australian resources company listed on the Australian Securities Exchange under
stock code MVL. Marvel Gold is a Mali-focused gold explorer with advanced gold exploration projects and
extensive landholdings in South and West Mali.
The Tabakorole Gold Project has a large existing resource with opportunities to expand along strike and via
regional exploration. The Lakanfla Gold Project is a major untested gold target 6km from the Sadiola gold
mine. Marvel Gold has an experienced board and management team with specific skills, and extensive
experience, in African based exploration, project development and mining.
Figure 7: Marvel Gold, Location of Mali Projects
Reference to previous ASX announcements
The information in this announcement that relates to previously reported exploration results at Lakanfla was
announced on 17 June 2020. Marvel confirms that it is not aware of any new information or data that
materially affects the information included in that announcement.
7
Table 1: Drillhole Locations
HoleID
Easting Northing RL
Dip
Azi
EOH
20LKFRC002 218695 1528033
148
-60
145
239
20LKFRC005 219944 1528300
161
-60
270
210
Table 2. JORC Table 1 Reporting – Section 1 Sampling Techniques and Data
Criteria
Sampling
Techniques
Drilling
techniques
Drill Sample
Recovery
Logging
Sub-Sampling
techniques
and sample
preparation
Explanation
Nature and quality of sampling (eg
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
Commentary
Reverse circulation samples are collected directly from the drill rig cyclone at 1
metre intervals. Samples were split with a cone splitter attached to the cyclone or
a 4 tier riffle splitter to yield an assay sample of approximately five kilograms in
weight. The sub-sample is marked and bagged on site.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
All samples are prepared by an independent laboratory, samples are crushed to 3mm, split and a 250g sub-sample is pulverised with gold determined by fire
assay/AAS based on a 30g charge.
Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter,
triple or standard tube, depth of
diamond tails, face-sampling bit or
other type, whether core is oriented
and if so, by what method, etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
RC drilling was completed using a face sampling bit to drill a hole of 125mm in
diameter. Holes were drilled with a dip of between 60 degrees or vertical
depending on the target.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential
loss/gain of fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of
the relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core
taken.
RC sample weights were recorded and monitored in order to calculate sample
recoveries. No relationship between sample weight and grade is known.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
RC samples have been sampled both wet and dry. Dry samples are riffle split off the
cyclone. Wet samples are allowed to settle before being spear or channel sampled.
RC sample weights have been collected to monitor recovery but no recovery
calculations for RC drilling have been completed.
All sample material is logged onsite by geologists to a level of detail to support
appropriate Mineral Resource estimation, mining studies and metallurgical studies.
Logging is qualitative and records colour, grain size, texture, lithology, weathering,
alteration, veining and sulphides. Chip trays are prepared by collecting
representative material from each metre sample and photographed.
All drill holes are logged in full.
Not applicable – no core drilling conducted.
8
Criteria
Quality
of
assay
data
and
laboratory
tests
Verification of
sampling and
assaying
Location of
data points
Data spacing
and
distribution
Explanation
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
instance
results
for
field
duplicate/second-half sampling.
The
nature,
quality
and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
Commentary
Sample preparation consisted of jaw crushing to -3mm, splitting 500 grams and
pulverizing to 95% passing 75µ. A sub-sample of 150-200g (pulp sample) is retained
for analysis.
The sample preparation procedures carried out are considered industry standard.
Field duplicates, Blanks and CRM are inserted at a rate of 1:30 which is considered
industry best practice.
Field Duplicates are the primary means of ensuring representativeness of sampling.
Not Applicable – no assays being reported.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and
model,
reading
times,
calibrations factors applied and their
derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates,
external
laboratory
checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
Not Applicable, no such work carried out.
The verification of significant
intersections by either independent
or alternative company personnel.
No significant intersections reported.
The use of twinned holes.
No twin holes have been drilled.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used
to locate drill holes (collar and downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic
control
All drill hole logging was completed on paper logging sheets and entered into
spreadsheets.
Data spacing for
Exploration Results.
Drill hole spacing is variable as this is a reconnaissance drill program.
reporting
of
Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the
Mineral Resource and Ore Reserve
estimation
procedure(s)
and
classifications applied.
Whether sample compositing has
been applied.
Field duplicates, Blanks and CRM are inserted at a rate of 1:30 which is considered
industry best practice.
No assay data is reported..
Drill hole collars were located using handheld GPS with 3-5m accuracy and initial
Dip and Azimuth determined using a handheld compass. A north-seeking
Gyroscope has been used to record drill hole deviation information.
Drill hole collars are recorded in WGS84 UTM Zone 29.
Not Applicable.
The drill hole spacing is not considered sufficient to establish the required degree
of geological and grade continuity for the estimation of mineral resources.
Samples have not been compositied.
9
Criteria
Orientation
of data in
relation to
geological
structure
Commentary
Drill holes are generally oriented perpendicular to the strike of geology and shallow
dips of drilling are used to intersect the structures at a high angle.
Sample
Security
Explanation
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
If the relationship between the
drilling
orientation
and
the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure
sample security.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
No audits have been conducted.
No assays are being reported.
Samples are being stored on site. No sample despatch has occurred.
Section 2. Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
Explanation
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Commentary
• Legend Gold Mali SARL is the 100% owner of the Lakanfla licence.
Acknowledgment and appraisal of
exploration by other parties.
The Lakanfla project was initially covered by regional geochemical sampling by
BRGM in the 1950’s and followed up by Klockner and the DNGM between 1989 and
1991 which resulted in the definition of Sadiola and the FE3 and FE4 pits. The
Sadiola license was redefined in 1998 and granted to Ambogo Consulting SARL
between 2000 and 2009 when it was finally Joint Ventured to North Atlantic
Resources.
•
The Lakanfla permit was granted under Arrêté N°2018-2734 on the 31st July
2018 and is due for its first renewal on the 31st of July 2021.
•
The licences was confirmed to be in good standing as of the 20th of September
2019 via letter of Attestation from the Malian DNGM. Subsequent due
diligence carried out by independent specialists engaged by the Company
confirmed that the licence is in good standing.
The majority of the work carried out subsequently has been by Legend Gold.
Geology
Deposit type, geological setting and
style of mineralisation
•
Drill
hole
information
A summary of all information
material to the understanding of the
exploration results including a
tabulation
of
the
following
information for all Material drill
holes:
All relevant drill hole details are provided in the announcement.
The Lakanfla license has a conceptual target defined by geophysics and based
on extrapolation of the geology from the ore features observed at Alamoutala,
Yatela and the Sadiola FE3 and FE4 pits, all directly along strike. The deposit
being targeted is a carbonate hosted, karst style, supergene gold deposit
analogous to the Yatela deposit.
o easting and northing of the
drill hole collar
o elevation or RL (Reduced
Level – elevation above sea
10
Criteria
Explanation
level in metres) of the drill
hole collar
Commentary
o dip and azimuth of the hole
o down hole length
interception depth
and
o hole length.
Data
aggregation
methods
Relationship
between
mineralisation
widths
and
intercept
lengths
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high
grades) and cut-off grades are usually
Material and should be stated.
No assay results reported.
Where
aggregate
intercepts
incorporate short lengths of highgrade results and longer lengths of
low-grade results, the procedure
used for such aggregation should be
stated and some typical examples of
such aggregations should be shown
in detail.
As above.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
No metal equivalents are reported.
These relationships are particularly
important in the reporting of
Exploration Results.
All intercepts reported as downhole lengths. True widths have not yet been
determined.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be
reported.
If it is not known only the down hole
lengths are reported, there should be
a clear statement to this effect (eg
‘down hole length, true width not
known’).
Diagrams
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These
should include, but not be limited to
a plan view of drill hole collar
locations and appropriate sectional
views.
See body of announcement for diagrams.
Balanced
reporting
Where comprehensive reporting of
all Exploration Results is not
practicable, representative reporting
of both low and high grades and/or
widths should be practiced to avoid
misleading reporting of Exploration
Results.
No grade information is being reported.
Other
substantive
exploration
data
Other exploration data, if meaningful
and material, should be reported
including (but not limited to):
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical
All applicable geological observations have been reported at this time.
11
Criteria
Explanation
test
results;
bulk
density,
groundwater, geotechnical and rock
characteristics; potential deleterious
or contaminating substances.
Commentary
Further work
The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
3,800m of exploration drilling to test targets at Lakanfla is planned in the current
program. Future work will depend on the results of this program.
Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
12
Share your feedback
Discover