MARVEL ENTERS INTO JOINT VENTURE AGREEMENT
WITH RESOLUTE MINING
Marvel Gold Limited (ASX: MVL) (Marvel or the Company) is pleased to announce that it
has entered into an earn-in and joint venture agreement with Resolute Mining Limited
over its Kolondieba Gold Project (Kolondieba) (JV Agreement). The JV Agreement follows
the satisfaction of conditions for completion of the acquisition of 100% of Kolondieba from
B2Gold Corp.
Under the terms of the JV Agreement, Resolute shall make an up-front payment of
USD250,000 to Marvel and can earn a 51% interest by sole-funding exploration
expenditure of USD750,000 at Kolondieba in the next 24 months. Resolute can earn a
further 19% by electing to sole-fund exploration expenditure of USD4,000,000 in the 36
months following its election to do so.
A summary of the key terms of the JV Agreement is shown in Appendix One.
Managing Director, Chris van Wijk, commented: “We are pleased to have commenced
this joint venture with Resolute Mining, who is a highly a credible and experienced
partner that is well respected in Mali.
Successfully negotiating a joint-venture with Resolute is a credit to the quality of work
carried out at Kolondieba and is testament to the prospectivity of the project and the
results achieved to date. We look forward to Resolute further advancing Kolondieba.
This transaction is consistent with Marvel’s strategy to monetise the exploration interests
we hold in Mali, as we progress ongoing project generation work.”
Previous work has highlighted the exploration opportunity at Kolondieba, with an auger
drilling program, that followed up results of soil sampling, having returned a number of
significant intercepts, including:1
2.35 g/t gold in auger hole 22KDBAG1337
1.54 g/t gold in auger hole 22KDBAG1474
1.68 g/t gold in hole 22KDBAG0646
1.65 g/t gold in hole 22KDBAG1027
2.01 g/t gold in hole 22KDBAG1039
The auger drilling identified three standout targets, each of which yielded significant gold
anomalism over 1km of strike length and several hundred metres across. It was these
three targets that were the focus of a follow up Gradient Array Induced Polarisation (GAIP)
geophysical survey (Figure 1).
1
ASX announcements 16 May 2022 and 22 June 2022
Figure 1: Auger drilling and GAIP survey areas2
This announcement has been approved for release by the Board.
For further information, please contact:
Chris van Wijk
Managing Director
T: +61 8 9200 4960
Amalie Schreurs
White Noise Communications
amalie@whitenoisecomms.com
T: +61 431 636 033
For more information, visit www.marvelgold.com.au.
2
ASX announcement 19 January 2023
PAGE 2 OF 6
TORRENSMINING.COM
REFERENCE TO PREVIOUS ASX ANNOUNCEMENTS
In relation to the exploration results included in this announcement, the dates of which
are referenced, the Company confirms that it is not aware of any new information or data
that materially affects the information included in those announcements.
In relation to the announcement of the Tabakorole Mineral Resource estimate on 5
October 2021, the Company confirms that it is not aware of any new information or data
that materially affects the information included in that announcement and that all
material assumptions and technical parameters underpinning the Mineral Resource in
that announcement continue to apply and have not materially changed.
APPENDIX ONE – SUMMARY OF KEY TERMS OF THE JV AGREEMENT
Key Term
Summary
Purpose of agreement
Under the terms of the earn-in and joint venture agreement
(JVA), form and enter into an unincorporated joint venture
(JV) to explore for, and if viable, develop and operate a
commercial gold mine at, and mine minerals at the
Kolondieba tenements (Tenements).
Commencement Date
26 May 2023
Conditions precedent
Marvel obtaining the approval by the Minister of Mines of
the joint venture agreement; and
Confirmation by such relevant Authority that this
Agreement complies with the OHADA Regulations.
Signing Bonus
On satisfaction of the Conditions Precedent, Resolute shall
pay a Signing Bonus to Marvel an amount equal to two
hundred and fifty thousand USD (USD $250,000).
Return of Signing Bonus
If Marvel fails to satisfy the Conditions Precedent within 24
months of the Commencement Date, Marvel must return
the Signing Bonus to Resolute.
Unincorporated joint
venture
The JV is initially unincorporated. At any time the parties
may agree to form an incorporated JV and an incorporated
JV agreement will be entered into which reflects the terms
of the unincorporated JV.
Initial interests
Marvel: 100%
Resolute: 0%
Manager of the JV
Resolute is the Manager of the JV on and from the
Commencement Date and is responsible for managing,
supervising, and conducting activities associated with the
JV.
Initial earning right
Resolute may earn a 51% interest (Initial Earned Interest) by
spending not less than USD750,000 on exploration within
24 months of the Commencement Date (Initial Earning
Period).
PAGE 3 OF 6
TORRENSMINING.COM
Key Term
Summary
Interests at the end of the
Initial Earning Period
Upon incurring USD750,000 of expenditure on the
Exploration Program, the parties’ interests shall be:
Marvel: 49%
Resolute: 51%
Failure to spend
USD750,000 in the Initial
Earning Period
If Resolute does not spend USD750,000 during the Initial
Earning Period, it will not be entitled to make the Phase 2
Election, will not earn any interest in the JV and the JVA will
terminate.
Additional Earning Right
Following (and subject to) Resolute earning its 51% interest,
Resolute may elect in its absolute sole discretion to earn a
further nineteen per cent (19%) interest (Additional Earned
Interest) by sole-funding Exploration Expenditure on the
Tenements of not less than USD4,000,000 within 36 months
of earning its 51% interest in the JV (Phase 2 Election).
Phase 2 Election
Resolute must elect whether or not to exercise the right to
earn the Additional Earned Interest within 60 days from
having earned its Initial Earned Interest.
Interests at the end of
Phase 2
If Resolute incurs USD4,000,000 of expenditure on the
Phase 2 Exploration Program, the parties’ interests shall be:
Marvel: 30%
Resolute: 70%
Failure to make a Phase 2
Election
If Resolute does not make a Phase 2 Election, Resolute will
withdraw from the JV and the JVA will terminate.
Failure to spend
USD4,000,000 in Phase 2
If Resolute makes a Phase 2 Election but does not incur
USD4,000,000 of expenditure on Phase 2 Exploration
Expenditure on the Tenements, then Resolute shall not earn
the additional 19% interest.
Marvel contribution or
dilution
Subject to Resolute earning its 70% interest, Marvel and
Resolute must contribute in accordance with their
respective JV interests, or have their interest diluted.
Resolute Call Option
Within 12 months of having earned a 70% interest, Resolute
may acquire Marvel’s 30% interest by paying USD5,000,000.
Marvel Put Option
Within 12 months of Resolute having earned a 70% interest,
Marvel may transfer its 30% interest to Resolute and receive
USD5,000,000.
Interests on exercise of the
Resolute Call Option or
Marvel Put Option
Marvel: 0%
Failure to exercise the
Resolute Call Option or
Marvel Put Option
Marvel may continue to contribute in accordance with its JV
interest; or
Resolute: 100%
PAGE 4 OF 6
TORRENSMINING.COM
Key Term
Summary
Withdraw from the JV, transfer its JV interest to Resolute
and receive USD10,000,000.
PAGE 5 OF 6
TORRENSMINING.COM
ABOUT MARVEL GOLD
Marvel Gold Limited is an Australian resources company listed on the Australian
Securities Exchange under stock code MVL. Marvel is a Mali-focused gold explorer with
advanced gold exploration projects in South Mali.
The Tabakorole Gold Project has a JORC Mineral Resource of 1.025Moz grading 1.2 g/t
gold (see ASX announcement dated 5 October 2021), with strong growth prospects along
strike and via near-deposit prospectivity.
Pursuant to the disposal of the Chilalo Graphite Project, Marvel also holds 50 million
shares in ASX listed graphite company, Evolution Energy Minerals Limited (ASX Code:
EV1), which are escrowed until November 2023.
Marvel has an experienced board and management team with specific skills and
extensive experience in exploration, project development and mining.
Tabakorole Mineral Resource Estimate as at 5 October 2021 (JORC 2012)
Indicated
Inferred
Total
Mt
Au
(g/t)
koz
(Au)
Mt
Au
(g/t)
koz
(Au)
Mt
Au
(g/t)
koz
(Au)
Oxide
1.4
1.2
50
1.3
1.3
55
2.7
1.3
110
Fresh
7.8
1.2
310
16.0
1.2
610
23.8
1.2
915
Total
9.2
1.2
360
17.3
1.2
665
26.5
1.2
1,025
Note: Reported at a cut-off grade of 0.6 g/t Au, differences may occur due to rounding.
Mali Gold Projects Location Map