High priority targets identified at Hanang
Released
Released
Announcement PDF
27 March 2026
HIGH PRIORITY
TARGET CORRIDORS IDENTIFIED AT HANANG
DRILLING TO COMMENCE IN APRIL
HIGHLIGHTS
• Completion of drone borne magnetic survey covering 380km2
, and receipt of all
results.
• Entire data set now interpreted, with the known corridor of mineralisation to the
east of New York Target extended.
• Identification of previously unknown structural corridor to the northeast of licence
blocks – Phoenix Trend.
• Mandatory drill tender underway for an initial 10,000m RC program, expected to
commence in April.
Marvel Gold Limited (ASX: MVL) (Marvel or the Company) is pleased to announce that it has
received the final results from the drone borne magnetic survey carried out at the Hanang Gold
Project (Hanang or the Project), located in the Singida Region of Tanzania. The Project is owned
by the Company’s wholly owned Tanzanian subsidiary Cobra Resources Limited (Cobra).
The Company flew a 5,389 line-kilometre drone borne magnetic survey utilising Tanzanian
owned SkyPM Solutions Limited. The program commenced in November 2025 and was
completed during February 2026. The data has been processed and quality checked and
subsequently interpreted by the Company’s geologists to identify structural features considered
prospective for gold mineralisation.
The geophysical data is of high quality and will be used in conjunction with existing geochemical
studies to plan and subsequently commence the Company’s maiden drill program, which as
per local Tanzanian requirements is currently under tender. It is anticipated that following the
award of the drilling contract, mobilisation of the drill contractor will be immediate. This is
expected to occur in April.
Executive Director Tim Strong commented:
“This work represents a significant step forward in our understanding of the total Hanang
Project. The identification of additional multiple high-priority targets within a proven
mineralised structural corridor provides Marvel with a strong pipeline of drill-ready
opportunities.
With shallow targets and strong geochemical support, we are well positioned to deliver an
active and results-driven exploration campaign. We are currently working with the Mining
Commission in Tanzania to complete a mandatory drill tender process which we expect to be
finalised in the near future.
2
Whilst the short delay in the drill program is frustrating, the Company is deliberately taking a
disciplined approach to ensure full compliance with Tanzanian laws, regulations and local
content requirements.
Our expectation is that Marvel’s initial RC drilling program at Hanang will commence in April
following completion of the current drill tender process.’’
Geophysical Data Analysis
In November 2025, the Company commenced a 5,389 line-kilometre drone borne magnetic
survey over the entirety of the Company’s land holding at Hanang (380km2
including the Pagani
Acquisition licences1
). A 100% Tanzanian owned geophysics contractor employed state-of-the-
art drones and magnetic data collection tools. This survey was completed during February 2026
and subsequently the data has now been analysed.
In addition to the previous results released on 23 January 2026, the Company has identified
additional geophysical and structural targets for follow-up mapping, geochemical verification
and drill testing. This includes a newly identified extension to the known New York system and
the newly discovered Phoenix trend.
Figure 1: Total Magnetic Intensity with drill targets
1
MVL ASX Announcement – 15 September 2025
3
Figure 2: Interpreted Structures and trends
The New York prospect is an area of outcropping quartz mineralisation within a shear zone
previously exploited by small scale miners. The initial strike of known mineralisation was
approximately 1km. The results of the geophysics survey indicated that this is part of a larger
‘stacked’ system of quartz veining within a corridor of 3km. Adjacent to this structure at New
York appears to be a large fold system that has been sheared and re-folded several times, this is
represents a structurally favourable setting for gold mineralisation.
In the far northeast of the licence blocks the Company has identified a previously unknown area
of interest. An abundance of late, non-mineralised, dolerite dykes had previously masked any
significant structure in the area, however on processing of the tighter spaced geophysics
recently collected, three sets of east-west to east-south-east west-north-west trending fault
zones with a predominant sinistral offset of lithologies are interpreted. This area, referred to as
Phoenix, is an early-stage structural target which will require some level of ground truthing prior
to drilling.
Next Steps
The Company is currently in the tender phase for a 10,000-metre reverse circulation (RC) drilling
program. The proposed campaign will target areas of prospective gold mineralisation identified
through previous soil sampling, geological mapping, and the recently completed geophysical
survey. The program is expected to 60-80 holes with a maximum depth of 150m. These holes
will target the previously announced geophysics and geochemistry targets, common in the
Winston Extension and Sophia area before moving further west and north on the property.
4
Unseasonably wet conditions and a prolonged rainy season have temporarily impacted field
access, and as such the Company is undertaking the RC drilling tender process to ensure
compliance with Tanzanian local content requirements. It is anticipated that the Company
expects to award the tender in April with a focus on selecting a contractor capable of rapid
mobilisation.
This announcement has been approved for release by the Board.
For further information, please contact:
TIMOTHY STRONG
Executive Director
Tel: +61 8 9200 4960
Email: info@marvelgold.com.au
Web: www.marvelgold.com.au
Competent Person’s Statement
The information in this announcement relates to exploration results at Hanang and is based on
information compiled by Company geologists and by Mr Timothy Strong, in his capacity as
Executive Director of Marvel Gold Limited.
Mr. Strong is a Member of the Institute of Materials, Minerals and Mining, with a Qualified for
Minerals Reporting designation, and has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
(2012 JORC Code). Mr. Strong consents to the inclusion in the report of the matters based upon
the information in the form and context in which it appears.
About Marvel Gold
Marvel Gold Limited is an Australian resources Company listed on the Australian Securities
Exchange under stock code MVL. Marvel recently acquired the Hanang Gold Project in Tanzania,
located on the highly prospective Iramba-Sekenke Greenstone Belt of Tanzania.
Marvel has an experienced board and management team with specific skills and extensive
experience in exploration, project development and mining.
5
Appendix 1. Drone Magnetic Survey
Operator SkyPM Solutions Ltd – Tanzania
Drone Multirotor drone system (DJI M350 RTK)
Navigation Real-time kinematic (RTK) GPS solution for
aircraft line navigation with base station
transmission correction. RTK allows a
standard deviation in the X and Y direction of
under 0.1 metres and for Z under 0.2 metres.
Positional updates are provided at 10Hz.
Magnetometer MagArrow and Gemsystem GSM 19
Overhauser Magnetometer (Base station)
Flight Specification • Line Spacing: 75m
• Line Orientation: 00
• Line km: 5,389
• Mean Altitude: 35m
• Tie Lines: 1,000m
Data Processing • Completed by Tau GeoSystems
(Pty) Ltd.
• Locations in ARC1960, projection
UTM36S Easting and Northings
• Lag and heading errors computed
and removed
• IGRF correction to remove regional
geomagnetic field variations. Value
removed from the Diurnal
corrected TMI
• Gridding in Oasis Montaj for
interpolation
• Micro levelling to decorrugate the
data
• Reduction to equator to micro
levelled grids (declination -0.11o
,
Inclination -30.60o
)
Data Products • Total Magnetic Intensity (TMI)
• First and Second Vertical
Derivatives (1VD, 2VD)
• Analytical Signal (AS)
• Horizontal Gradient (HG)
6
Figure 1: Flight Lines of Survey area on Cobra Licences
7
Appendix 2. JORC Table 1 Reporting.
Section 1 - Sampling Techniques and Data
Criteria Explanation Commentary
Sampling
Techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to
the minerals under investigation, such
as down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
N/A
Aspects of the determination of
mineralisation that are Material to
the Public Report.
N/A
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether
core is oriented ,and if so, by what
method, etc).
N/A
Drill Sample
Recovery
Method of recording and assessing
core and chip sample recoveries and
results assessed.
N/A
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
N/A
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
N/A
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
N/A
The total length and percentage of
the relevant intersections logged.
N/A
8
Criteria Explanation Commentary
Sub-Sampling
techniques
and sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core
taken.
N/A
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
N/A
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
N/A
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
N/A
Measures taken to ensure that the
sampling is representative of the in-
situ material collected, including for
instance results for field
duplicate/second-half sampling.
N/A
Quality of
assay data and
laboratory
tests
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
N/A
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and model, reading times,
calibrations factors applied and their
derivation, etc.
Geophysical techniques deployed are summarised in Appendix 1
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
N/A
Verification of
sampling and
assaying
The verification of significant
intersections by either independent
or alternative company personnel.
N/A
The use of twinned holes. N/A
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
N/A
Discuss any adjustment to assay data. N/A
Location of
data points
Accuracy and quality of surveys used
to locate drill holes (collar and down-
hole surveys), trenches, mine
N/A
9
Criteria Explanation Commentary
workings and other locations used in
Mineral Resource estimation.
Specification of the grid system used All results reported use WGS84 UTM Zone 36S Arc 1960
Quality and adequacy of topographic
control
N/A
Data spacing
and
distribution
Data spacing for reporting of
Exploration Results.
N/A
Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
N/A
Whether sample compositing has
been applied.
N/A
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
N/A
If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.
N/A
Sample
Security
The measures taken to ensure sample
security.
N/A
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
N/A
Section 2 - Reporting of Exploration Results
Criteria Explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The exploration work that is the subject of this announcement was conducted over
the Hanang Project. The Hanang Project consists of 6 Prospecting licences which are
held 100% by Marvel’s 100% owned subsidiary Cobra Resources as well as two
applications.
The Licences numbered PL 11732/2021, PL 11744/2021, PL 11743/2021, PL
11733/2021 and PL 11734/2021 were granted in December 2021 for a period of four
years. The licences were renewed in December 2025 and as per the Mining Act 2019
for the first renewal period of three years.
Licence PL 13490/2025 was granted in September 2025 for a period of four years.
Licences PL/32439/2025 and PL/32438/2025 are under application as of March
2026.
10
Criteria Explanation Commentary
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
There are no known impediments to operating on any of the licences.
Exploration
done by other
parties
Acknowledgment and appraisal of
exploration by other parties.
Parts of the licences have been previously explored by Tanga Resources. Exploration
consisted of minimal soil sampling and geophysics.
Geology Deposit type, geological setting and
style of mineralisation
The tenements are thought to be prospective for orogenic, hydrothermal gold
deposits, with features in common with other volcano-sedimentary hosted orogenic
gold deposits found throughout the region.
Drill hole
information
A summary of all information material
to the understanding of the
exploration results including a
tabulation of the following
information for all Material drill holes:
o easting and northing of the
drill hole collar
o elevation or RL (Reduced
Level – elevation above sea
level in metres) of the drill
hole collar
o dip and azimuth of the hole
o down hole length and
interception depth
o hole length.
N/A
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts
incorporate short lengths of high-
grade results and longer lengths of
low-grade results, the procedure used
for such aggregation should be stated
and some typical examples of such
aggregations should be shown in
detail.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly
important in the reporting of
Exploration Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
If it is not known only the down hole
lengths are reported, there should be
a clear statement to this effect (eg
It is thought that mineralization is controlled by a broad set of splays off a main east-
west shear zone. The project is at an early stage and therefore geometry of any
mineralization cannot be inferred to with confidence.
11
Criteria Explanation Commentary
‘down hole length, true width not
known’).
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These
should include, but not be limited to a
plan view of drill hole collar locations
and appropriate sectional views.
See body of announcement for diagrams.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low
and high grades and/or widths should
be practiced to avoid misleading
reporting of Exploration Results.
Geophysics analysis is completed for the licence area.
Other
substantive
exploration
data
Other exploration data, if meaningful
and material, should be reported
including (but not limited to):
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical
test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious
or contaminating substances.
Geophysical survey details are provided in Appendix 1.
Further work The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the
areas of possible extensions, including
the main geological interpretations
and future drilling areas, provided this
information is not commercially
sensitive.
Maiden drill targeting is underway, for a Q2 reverse circulation drill campaign.
Share your feedback
Discover